Created: MO created following manufacturing principles:
Make to stock
Make to order
Configure to order
Engineer to order
Scheduled: Materials and resources estimated. The estimation generates inventory transactions for raw materials that
have a status of On order. The receipts for main products, co-products, and by-products are generated when production
orders or batch orders are estimated. MO have set dates
Released: MO to be released into the shop floor. The material availability checked. Materials ready to be picked
Started: Resource and material consumption starting. MO can't be rescheduled at this point.